Monday, April 23, 2007



Over the weekend I removed the rest of the insulation from the engine room, removed some built-in shelves and drawers and water lines which ran to the previously installed water maker. I also removed the throttles, and gear controls and cables to the engine room, and removed the old wiring harnesses along with the helm control panel (and 1000 wires) which will need to be redesigned following receipt of the "Vessel View" controls and digital system screen.
Friday the Cummins QSC 8.3 540 HO Engines were order. The order was confirmed in an e-mail today, and delivery to Summerville is expected May 25, 2007.

No comments: